Loading...
HomeMy WebLinkAboutIntermountain Gas 230201 OQ Training Pocatello Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 1-Feb-23 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:FI Construction:71 Training: = (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: � Damage Prevention: D&A: Inspection Summary A OQ training inspection was performed on IGC personnel at IGC's Pocatello office. 1 Feb 2023 (1.0 OQ Training) On 1 Feb I observed IGC gas crews and service techs being classroom trained by IGC's training personnel and performing hands on training on 2" Met Fits, 2"Electro Fusion, 3/4" Stab Fittings and Butt Fusion on 2" and 3/4" piping. Attachments: Attendance sheets for all training classes Corrective Action Required: Follow-up Required: Yes No X Yes No Fx_1 by(date): Inspector (lead): Date: Bruce Perkins 2/1/2023 Reviewer: Date: Jeff Brooks IPUC Form 1