HomeMy WebLinkAboutIntermountain Gas 230201 OQ Training Pocatello Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 1-Feb-23
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:FI Construction:71 Training: = (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: � Damage Prevention: D&A:
Inspection Summary
A OQ training inspection was performed on IGC personnel at IGC's Pocatello office.
1 Feb 2023 (1.0 OQ Training)
On 1 Feb I observed IGC gas crews and service techs being classroom trained by IGC's training personnel and
performing hands on training on 2" Met Fits, 2"Electro Fusion, 3/4" Stab Fittings and Butt Fusion on 2" and 3/4"
piping.
Attachments:
Attendance sheets for all training classes
Corrective Action Required: Follow-up Required: Yes No X
Yes No Fx_1 by(date):
Inspector (lead): Date:
Bruce Perkins 2/1/2023
Reviewer: Date:
Jeff Brooks
IPUC Form 1