HomeMy WebLinkAboutIntermountain Gas 2023 IPUC Rexburg LNG Audit Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): 113rooks, Perkins, Galli I Date(s): 10/16-18/2523
Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 8160
Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 8.5
Standard: 8.5 Training: (T)(D)Integrity Management: Incident:
Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
October 3 & 4, 2023: (2.0 Standard Prep)(Perkins)
Reviewed the Rexburg LNG plant Records, Emergency Manual, Fire Manual, Operations Procedure Manual,
Preventative Maintenance Guide, Plant Maintenance Training Manual, Equipment Operations Manual and
Security Training Manuals for compliance with 49 CFR part 193, NFPA 59A. Prepared for the LNG inspection
through review of the inspection forms.
October 16, 2023: (3.0 Standard)(Perkins, Brooks, Galli)
Perkins, Brooks and Galli of the Idaho Public Utilities Commission met virtually with Intermountain Gas
Company personnel Darren Tinnerstet, Wendy McDonough, Russ Nishikawa, Daniel Osterhout and David Estep
to conduct an audit of procedures and records review for plant operations for calendar year 2022. The PHMSA
Inspector Assistant(IA) Program was used to conduct an LNG Facility Inspection on the procedural and records
manual as they applied to the facility. An IA Post Inspection Preliminary Findings (exit interview) was
performed following the inspection with Darren Tinnerstet and Daniel Osterhout.
Oct 17, 2022: (1.0 Standard Travel)(Perkins, Galli)
Traveled to Rexburg
October 18, 2023: (1.0 Standard)(Perkins, Galli)
Perkins and Galli of the Idaho Public Utilities Commission met with Intermountain Gas Company personnel,
Daniel Osterhout and David Estep at the Rexburg LNG Plant to conduct a field audit. The PHMSA Inspector
Assistant (IA) Program was used as a guide to conduct the field audit of the LNG Facility Inspection. An IA Post
Inspection Preliminary Findings (exit interview) was performed following the inspection with Daniel Osterhout,
David Estep and Darren Tinnerstet. See exit interview/LOC/NOPV for discreancies.
October 19, 2023: (1.0 Standard Travel)(Perkins, Galli)
Traveled back to Boise
October 19, 2023: (0.5 Standard Post)(Perkins)
Completed forms and typed report.
Recommendations are listed on IA Post Inspection Preliminary Findings (attached).
Attached:
IPUC Form 1, Inspection Summary
IA Post Inspection Preliminary Findings
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Corrective Action Required: NOPV 1202311 Yes X No
Follow-up Required: by (date): 12/3/2023 Yes X No
Inspector (Lead):
Perkins Date: 10/23/2023
Reviewer:
Date:
Brooks
IPUC Form 1