Loading...
HomeMy WebLinkAboutIntermountain Gas 2023 IPUC Form 1 - Nampa Field Audit Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks,Perkins, Galli Date(s): 5/22-24/2023 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPH) IS160 Inspection Type & Time (1 day, 0.5 day) Total Inspection Days:17 Standard: 16.5 1 Training: (T)(D)Integrity Management: Incident: Follow-up: OQ: 10.51 Damage Prevention. D&A: Inspection Summary Audit consisted of IPUC inspectors Brooks, Perkins and Galli inspecting field installed equipment for the Nampa,Idaho inspection units. The PHMSA IA question set and IGC equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. May 2,2023: (0.5 Standard Prep) Prepared for IGC Nampa Field Audit May 22-24,2023: (5.0 Standard) Met with IGC company representatives in the Nampa district office for in-brief and to begin field audit and review OQ records for all personnel taking part in the inspection. Regulator Stations: 48325-RS-60738, 48321-RS-59930,48321-RS-59936, 48321-RS-1153246, 48318-RS- 11286128, 48275-RS-59918, 48275-RS-59872, 48267-RS-59849,48267-RS-59881, 48271-RS-59878,48271-RS- 59875,48271-RS-59770,48271-RS-59884, 48263-RS-59863, 48263-RS-59728, 48371-RS-599781, 48371-RS- 599851, 48371-RS-59979, 48371-RS-82265, 48371-RS-60002, 48371-RS-59982, 48371-RS-59983, 48363-RS- 59887 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings,pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 8 casing-to-carrier isolation checks, five cathodic protection rectifiers,three pipeline patrols, and 17 emergency/ isolation valves were checked for proper operation, observations listed below. An IPUC Form 3 (exit interview)was performed following the district inspection with Colby Lundstrom (Compliance/Audit Manager)of Intermountain Gas Company. Reg Station: Failed lock-up Primary: 48275-RS-59918, 48363-RS-59887 corrected on the spot. Reg Station: Corrsion Control: 48267-RS-59849 downstream piping not protected(removed insulator), pipe wrap was fixed on-site. May 24, 2023: (0.5 Standard Post, 0.5 OQ) Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post Inspection Preliminary Written Findings and attached inspection documents. May 25,2023: (0.5 Standard Post) Wrote and sent NOPV IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: MUC Form 1, Field Equipment Work Sheets Corrective Action Required: NOPV I202304 Yes X No Follow-up Required: by(date): 8-Jul-23 Yes X No Inspector (Lead): �e 5 Date: 1s Q,3 Reviewer: Date: IPUC Form 1