HomeMy WebLinkAboutNorthwest Gas Processing 230410-13 NWGP Records, OQ, Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks, Galli I Date(s): 10-13 Apr 2023
Company/Owner: I Northwest Gas Processing Unit/OPID: 39370
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 5.5
Standard: �5 Construction: Training: (T)(D) Integrity Management: ❑ Incident: El
Gas Rule: Follow-up: OQ: o.5 Damage Prevention: ❑ D&A:
Inspection Summary
Audit consisted of inspecting Northwest Gas Processing's Record/OQ 2022,and Field Audit-2023. This
audit was performed in Boise/New Plymouth, Idaho.
Apr 10,2023 (1 Standard Prep)
Prepared for the Records/OQ/Field Audit of Northwest Gas Processing. Reviewed operators Operation and
Maintenance (O&M)Manual, OQ Manual, Records, IA Question sets and past inspections.
Apr 11-12 2023 (4.0 Standard)
Met with Northwest Gas Processing contracted representative to audit the companies Records/OQ programs
and Field audit. Following the audit an IA exit interview was conducted with Hope Shelton, Shelton
Consulting. No discrepancies were found.
Apr 13,2023 (.5 Standard Post)
Completed IPUC Form 1 for final review and filing
Attached:
IA Exit Interview
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No L
Inspector (Lead): Date:
Bruce Perkins �^ 4/13/2023
Reviewer: Date:
Jeff Brooks
IPUC Form 1