Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 230410-13 NWGP Records, OQ, Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): 10-13 Apr 2023 Company/Owner: I Northwest Gas Processing Unit/OPID: 39370 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 5.5 Standard: �5 Construction: Training: (T)(D) Integrity Management: ❑ Incident: El Gas Rule: Follow-up: OQ: o.5 Damage Prevention: ❑ D&A: Inspection Summary Audit consisted of inspecting Northwest Gas Processing's Record/OQ 2022,and Field Audit-2023. This audit was performed in Boise/New Plymouth, Idaho. Apr 10,2023 (1 Standard Prep) Prepared for the Records/OQ/Field Audit of Northwest Gas Processing. Reviewed operators Operation and Maintenance (O&M)Manual, OQ Manual, Records, IA Question sets and past inspections. Apr 11-12 2023 (4.0 Standard) Met with Northwest Gas Processing contracted representative to audit the companies Records/OQ programs and Field audit. Following the audit an IA exit interview was conducted with Hope Shelton, Shelton Consulting. No discrepancies were found. Apr 13,2023 (.5 Standard Post) Completed IPUC Form 1 for final review and filing Attached: IA Exit Interview Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No L Inspector (Lead): Date: Bruce Perkins �^ 4/13/2023 Reviewer: Date: Jeff Brooks IPUC Form 1