Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 230306-07 NWGP Gas Rule and PAP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Brooks, Galli I Date(s): 3/6-7/2023 Company/Owner: I Northwest Gas Processing (NWGP) I Unit#/OPID 139370 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4.5 Standard: 4.5 Construction: Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A Gas Rule and Public Awareness Program audit was conducted on Northwest Gas Processing with compliance consultant Hope Shelton, Shelton Consulting. February 16 & 23, 2023: (1.5) Standard Prep Prepped for NWGP Gas Rule and PAP audit by reviewing IA Question Set against Public Awareness Program, O&ME, Damage Prevention Program, SOPS and supporting records. March 6, 2023: (1.5) Standard Used the IA inspection program, eCFR,NWGP Public Awareness Progam, API 1162 and other information/records provided by the operator to conduct a 2022 Public Awareness Program audit and a Gas Rule Audit. All procedure questions in IA are in compliance with applicable code sections and API 1162 recommendations. NWGP was advised to ensure they're using agenda's/meeting minutes during emergency response liaison meetings. NWGP will provide the first annual review for the new PAP program in June 2023. March 7, 2023: (1.5) Standard Met with NWGP and Quality Line Locating (new contract)to review them process a one-call ticket. Completed IPUC Form 1 and sent IA Post-Inspection Written Preliminary Findings to Hope Shelton for Gas Rule and PAP audit. Attachments IPUC Inspection Form 1 IA Post-Inspection Written Preliminary Findings (Gas Rule and PAP) NWGP documents and records. Corrective Action Required: Yes VNoj X Follow-up Required: by (date): Annual Review-June 2023 Yes X I No Inspector(Lead): , ' Date: Perkins 3/7/2022 Reviewer: Date: Brooks 3/7/2022 IPUC Form 1