Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 2023 IPUC Form 1 - DPC Records Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lGalli I Date(s): 11/13/2023 Company/Owner: Douglas Pipeline Company (DPC) Unit#/OPID 131442 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11.5 Standard: 1.5 Construction:F] Training: F7 (T)(D) Integrity Management: E:1 Incident: Gas Rule: F� Follow-up: F-1 oQ: F-1 Damage Prevention: E] D&A: E] Inspection Summary Audit consisted of inspecting 2022 records for Douglas Pipeline Company(DPC) October 23,2023: (1.0 Standard) IPUC inspector Galli conducted a records audit on Douglas Pipeline Company virtually for the Langely-Gulch and Bennett Mountain transmission line segments with Andi Shacklett, Director of Regulatory Compliance. The PHMSA IA question set for the records portion was used as a guide throughout the audit to ensure all areas were completed as they pertain to required records. A complete list of attendees can be found in the IA inspection. Liaison with Public Officials was concerned due to Douglas Pipeline not having an adequate sign-in sheet for both pipeline segments. Additionally,Andi Shacklett was advised to loop in the Fire Department for the Langley Gulch segment and Police/Sheriff Departments for both pipeline segments. November 13,2023: (0.5 Standard post) Wrote the inspection report, completed audit forms: PHMSA IA question set including attenance sheet, IPUC Forms 1, Post-Inspection Written Preliminary Findings and attached inspection documents. Attached: IPUC Form 1, Inspection Summary Post-Inspection Written Preliminary Findings Supporting Document saved in file Corrective Action Required: Yesi No X Follow-up Required: by(date): Yes I No X Inspector (Lead): �. Date: Galli ` - =v ..- 11/13/2023 Reviewer: Date: Brooks )3 IPUC Form 1