Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 2023 Douglas TIMP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Brooks, Galli I Date(s): Isee Below Jan 18/19/23/24 2023 Company/Owner: I Douglas Pipeline Company(DPC) Unit#/OPID 131442 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 7.5 Standard:FI Construction: Training: (T)(D) Integrity Management: 7.5 Incident: Gas Rule: a Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors reviewing Douglas Pipeline Companies (DPC) Transmission Integrity Management Plan (TIMP) procedures and records for compliance with Part 192. This audit was completed virtually from the IPUC office in Boise, ID. January 18-19,2023: 3.0 (T)(D) Integrity Management Prep IPUC inspectors prepared for DPC TIMP procedures and records audit. Reviewed TIMP Procedures, Records and IA question set. January 23-24, 2023: 4.5 (T)(D) Integrity Management and Post Virtually met with Douglas Pipeline Company representative Andi Shacklett, Director of Regulatory Compliance to audit the companies TIMP procedures and records. Reviewed various documents to include Idaho Power Integrity management program summary, ECDA Reports, Element 2 threats/data/risk analysis forms, Appendix A, Coating restoration, Class location/HCA Identification, DPC IM elements 1-15 2022, OQ qualifications, Internal gas corrosion gas quality, 2011/2018 Integrity management assessments. An IA exit interview was conducted and results were sent to Andi Shacklett. Minor corrections to TIMP program were identified . Completed IPUC Form 1 and IA exit interview. Corrective Action Required: Sce. Yes X I No Follow-up Required: by (date): July 23 Yes X I No Inspector (lead): Date: Perkins Reviewer: Brooks Date: �_�r/, `13 IPUC Form 1