Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 2023 Douglas Field Audit - Langley-Bennett Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks Date(s): 9/26/23 -9/27/23 Company/Owner: Douglas Pipeline Company I Unit#/OPID 31442 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard: 1 1.5 1 Training: I (T)(D)Integrity Management: Incident: Follow-up: I I OQ: 1 0.5 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment for Douglas Pipeline Companies Langley Gulch LG(New Plymouth) and Bennett Mountain BMT (Mountain Home) districts. September 26,2023: (0.5 Standard Prep) Preparation for Langley Gulch and Bennett Mountain Field Audits September 26,2023: (.5 Standardl Audit included: 16 CP test station readings, verification of valve functionality(Langley Gulch-V 1001, V 1002, V 1003, V 1004) and ROW line marker inspections. (2) CP readings were outside of compliance with readings not achieving the-.850 my minimum at Bennett Mountain (Test stations 2 and 3). September 27, 2023: (0.5 Standard Post, 0.5 OQ) Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Attached: IPUC Form 1,Preliminary Written Findings, OQ Corrective Action Required: NOPV#DP202301 Yes x No Follow-up Required: by(date): Yes I x I No Inspector(Lead): - ate: Brooks 9/27/2023 Reviewer: Brooks Date: 9/27/2023 IPUC Form 1