Loading...
HomeMy WebLinkAboutAvista 230717-21 Sandpoint Construction IPUC Construction Inspection Inspector(s): Perkins (5.0), Brooks (.5) Date(s): 17-21 July 2023 Galli .5 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: See in comments City/District: Sandpoint district Contractor/Job #: Foreman: Mark Employees: See OQ's See in comments Plaster Job Description: See in comments Circle: Distribution Operator Supervisor: One-Call Ticket: Y On-Site: Y Brian Schrimsher See in comments Total Inspection Days: 6 Tasks: Rating Critical Procedure# Comments 1. Materials-Handling, Storage, SAT 3.12-13 Labeling 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin Backfill SAT 3.15 4. Pipe Installation Tracer Wire SAT 3.13 5. Valve Installation SAT 2.14 6. Coating Condition N/A 2.12 7. Manuals-Field Procedures, O & M SAT 1.4 8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation N/A 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping SAT 3.22 13. Meter Location/Regulator Testing SAT 2.22 14. Equipment Calibration Verification SAT 5.11,14,21 15. EFV Installation SAT 3.16 16. MAOP N/A 4.15 17. Pure SAT 3.17 18. Safety Equipment SAT 19. Abandonment SAT 5.16 20. Line Locating SAT 21. Plastic Pipe SAT 3.23,24,25 Lyco fittings, electro- - Joiner(s) Qualified fuse, bolt on tee, butt- - Fusion Tools fuse - Heat Plate - Joining Procedure 22. Steel Pipe N/A 3.22 - Welder(s) Qualified - Pipe/Coating Inspected/Repaired - Cathodic Protection -Non-Destructive Testing - Welding Procedures IPUC Form 4 IPUC Construction Inspection Additional Comments: -July 17, 2023: (1 Standard Travel) --Traveled to Sandpoint, ID to conduct new construction inspections. -July 18, 2023: IPUC inspector observed a NPL crew cut& cap 6" PE main in 2 locations at 3414 N Boyer Road for Boyer Road relocate in Sandpoint Idaho. Items observed include: abandonment of 700' of pipe and sealing of pipe ends, line locating, trenching, tracer wire, electro-fuse caps,blowdown of pipe, squeezing, lyco fittings, bedding/backfill. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. -July 19, 2023: IPUC inspector observed a NPL crew tie in 1945' of 2" PE to 4" main in 2 locations at 509909 Hwy 95 (Sturgeon Station truck stop) Items observed include: line locating, trenching, tracer wire, electro-fuse 4"x2"tees and couplers, fusing 2-2" valves on piping, squeezing, lyco fittings, 2 hour pressure tests on entire pipe, install 41b anodes on tracer wire, valve riser install and bedding/backfill. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. -July 20, 2023: IPUC inspectors observed a NPL crew finish tie in of 1945' of 2" PE to 4"main in 2 locations at 509909 Hwy 95 (Sturgeon Station truck stop) Items observed include: tracer wire, lyco fittings, purging of pipeline and gas quality testing, squeezing, blow down/setting and gas quality testing of service line/meter, install 41b anodes on tracer wire, valve riser install and bedding/backfill. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. --July 20, 2023: IPUC inspectors observed a NPL crew install 3/ service line from stub to 101 Tonka Way, Bonners Ferry, Idaho. Items observed include: tracer wire, squeezing, lyco fittings, purging of pipeline, gas quality testing,pressure test of service line/riser and meter install, setting of 7" water columns on meter and bedding/backfill. Verified OQs of three NPL employees. Quizzed employees on applicable ADCs. All procedures were followed. -July 21, 2023: (1 Standard Travel) --Traveled to back to Boise, ID to conclude new construction inspections in Sandpoint District. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 21 Perkins Div July 2023 Reviewer: Date: Brooks IPUC Form 4