Loading...
HomeMy WebLinkAboutAvista 230607 Rathdrum Construction I PUC Construction Inspection Inspector(s): Perkins Date(s): 7 June 2023 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 12698/12702 N Krauss Circle, City/District: Rathdrum 5992/5977/6020 W Theisman Contractor/Job #: Foreman: Jesse Lemon Employees: Kelly Skurupey,William Kusler See Job Tickets in file Job Description: Install 3/" service Circle: Distribution Operator Supervisor: One-Call Ticket: N On-Site: N None required as trenches were already dug Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials-Handling, Storage, SAT 3.12-13 Labeling 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin Backfill SAT 3.15 4. Pipe Installation Tracer Wire SAT 3.13 5. Valve Installation N/A 2.14 6. Coating Condition N/A 2.12 7. Manuals-Field Procedures, O &M SAT 1.4 8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 104PSI for 10 Min 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation N/A 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping N/A 3.22 13. Meter Location/Regulator Testing SAT 2.22 14. Equipment Calibration Verification SAT 5.11,14,21 In the file 15. EFV Installation N/A 3.16 16. MAOP N/A 4.15 17. Pure N/A 3.17 18. Safety Equipment SAT 19. Abandonment N/A 5.16 20. Line Locating N/A 21. Plastic Pipe SAT 3.23,24,25 Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure 22. Steel Pipe N/A 3.22 - Welder(s) Qualified - Pipe/Coating Inspected/Repaired - Cathodic Protection -Non-Destructive Testing - Welding Procedures IPUC Form 4 IPUC Construction Inspection Additional Comments: IPUC inspector observed a NPL crew install a 3/4" service line 12698/12702 N Krauss Circle, 5992/5977/6020 W Theisman, Rathdrum, ID that included, trenching, lyco fittings, tracer wire, purging, pressure testing, riser/meter bar&meter install and calibration, bedding/backfill. Trenches were already dug by power line contractor but needed cleaned up and expanded. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 7 Perkins �` June 2023 Reviewer: Date: Brooks IPUC Form 4