HomeMy WebLinkAboutAvista 230606 Post Falls Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 6 June 2023
Company/Owner: Avista Utilities Unit/OPID: 31232
Address: 452 S Mcguire Rd City/District: Post Falls
Contractor/Job #: Foreman: Kurtis Employees: Jerome Moss, Hunter Richins
1026999905 Gilbert
Job Description: Install 1/4" service Circle: Distribution
Operator Supervisor: One-Call Ticket: Y
On-Site: Y 231520066
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials-Handling, Storage, SAT 3.12-13
Labeling
2. Trenching/Boring -Depth, Clearance SAT 3.15
3. Beddin /Backfill SAT 3.15
4. Pipe Installation Tracer Wire SAT 3.13
5. Valve Installation N/A 2.14
6. Coating Condition N/A 2.12
7. Manuals-Field Procedures, O & M SAT 1.4
8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 Left 60 psi on line
9. OQ Qualifications SAT 4.31
10. Casing Seal/Installation N/A 3.42
11. Service Line Installation SAT 3.16
12. Tie-In/Hot Tapping N/A 3.22
13. Meter Location/Regulator Testing N/A 2.22
14. Equipment Calibration Verification N/A 5.11,14,21
15. EFV Installation N/A 3.16
16. MAOP N/A 4.15
17. Pure N/A 3.17
18. Safety Equipment SAT
19. Abandonment N/A 5.16
20. Line Locating N/A
21. Plastic Pipe SAT 3.23,24,25 Lyco fittings
- Joiner(s) Qualified
- Fusion Tools
- Heat Plate
- Joining Procedure
22. Steel Pipe N/A 3.22
-Welder(s) Qualified
- Pipe/Coating Inspected/Repaired
- Cathodic Protection
-Non-Destructive Testing
IPUC Form 4
IPUC Construction Inspection
-Welding Procedures
Additional Comments:
IPUC inspector observed a NPL crew install a 3/4" service line 452 McGuire Rd, Post Falls, ID that
included line locating, trenching, tracer wire, lyco fittings,bedding/backfill. The job could not be
completed because they did not have a right of way permit to tie-into 2"main on edge of the road. Crew
left 60PSI on the line until tie-in can happen. Verified OQs of three NPL employees. Quizzed
employees on applicable AOCs. All procedures were followed.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): / Date: 6
Perkins % June 2023
Reviewer:
Date:
Brooks
IPUC Form 4