Loading...
HomeMy WebLinkAboutAvista 230606 Post Falls Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 6 June 2023 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 452 S Mcguire Rd City/District: Post Falls Contractor/Job #: Foreman: Kurtis Employees: Jerome Moss, Hunter Richins 1026999905 Gilbert Job Description: Install 1/4" service Circle: Distribution Operator Supervisor: One-Call Ticket: Y On-Site: Y 231520066 Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials-Handling, Storage, SAT 3.12-13 Labeling 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin /Backfill SAT 3.15 4. Pipe Installation Tracer Wire SAT 3.13 5. Valve Installation N/A 2.14 6. Coating Condition N/A 2.12 7. Manuals-Field Procedures, O & M SAT 1.4 8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 Left 60 psi on line 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation N/A 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping N/A 3.22 13. Meter Location/Regulator Testing N/A 2.22 14. Equipment Calibration Verification N/A 5.11,14,21 15. EFV Installation N/A 3.16 16. MAOP N/A 4.15 17. Pure N/A 3.17 18. Safety Equipment SAT 19. Abandonment N/A 5.16 20. Line Locating N/A 21. Plastic Pipe SAT 3.23,24,25 Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure 22. Steel Pipe N/A 3.22 -Welder(s) Qualified - Pipe/Coating Inspected/Repaired - Cathodic Protection -Non-Destructive Testing IPUC Form 4 IPUC Construction Inspection -Welding Procedures Additional Comments: IPUC inspector observed a NPL crew install a 3/4" service line 452 McGuire Rd, Post Falls, ID that included line locating, trenching, tracer wire, lyco fittings,bedding/backfill. The job could not be completed because they did not have a right of way permit to tie-into 2"main on edge of the road. Crew left 60PSI on the line until tie-in can happen. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): / Date: 6 Perkins % June 2023 Reviewer: Date: Brooks IPUC Form 4