HomeMy WebLinkAboutAvista 230607 IPUC Form 1 - CDA field Audit Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Brooks, Galli Date(s): June 5th-June 8th, 2023 Company/Owner: jAvista Utilities Unit/OPID: 131232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 8 Standard: Construction: Training: (T)(D) Integrity Management:: Incident: Gas Ruler Follow-up: Oct: Damage Prevention: D&A: Inspection Summary Field audit consisted of inspecting operating equipment in the Coeur d'Alene, Idaho(CDA)district. February 2,2023: (0.5 Standard Prep) Prepared for Coeur d'Alene Field Audit June 5, 2023: (2.0 Standard Travel) Traveled to Coeur d' Alene (Brooks and Galli) June 6-7,2023: (4.0 Standard) IPUC inspectors Brooks and Galli conducted a field equipment audit of Avista's CDA district. The audit included: Review of construction records, welding records, emergency manual, 7 regulator stations(212*, 4246*,4247*, 614, 604, 2029 and 5130) 3 carrier/casings, 3 rectifiers, 12 control valves, and 3 farm taps.Traffic control was utilized for a few control valves. Three regulator stations (604 W/M) (2029 W) (4246 W/M)failed lockup due to fouling(assumed dithiazine) issues and an mechanical damage on a pilot stem. The regulator stations were repaired on-site by replacing pilot stems, diaphragm and orifice o-rings during the audit. June 8, 2023: (1.0 Standard Travel) Traveled back to Boise (Galli). June 12,2023: (0.5 Standard Post) Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, Post Inspection Written Preliminary Findings and attached inspection documents. Attached: IPUC Form 1, Inspection Summary Post-Inspection Written Preliminary Findings IPUC Field Equipment Status Worksheets Corrective Action Required: Yes No X Follow-up Required: by (date): 2024 Field Audit Yes X No Inspector(Lead): Date: 6/12/2023 Brooks Reviewer: Date: IPUC Form 1