Loading...
HomeMy WebLinkAboutAvista 2023 IPUC Form 1 - PAP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks, Galli I Date(s): 8/15/2023 Company/Owner: lintermountain Gas Company(IGC) Unit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2.5 Standard: 2.5 1 Training: (T)(D)Integrity Management: Incident: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A joint Public Awareness Program audit was conducted with WUTC on Avista Utilities. July 27, 2023: (1.0) Standard Prep Prepped for Avista PAP audit by reviewing IA Question Set against Public Awareness Program and supporting records. August 15, 2023: (1.0) Standard Used the IA inspection program, eCFR, Avista Public Awareness Progam, API 1162 and other information/records provided by the operator to conduct a 2023 Public Awareness Program audit. All procedure questions in IA are in compliance with applicable code sections and API 1162 recommendations. It was recommended that Avista personnel improve liaison with police departments and public officials. August 15, 2023: (0.5) Standard Post Completed IPUC Form 1 and sent IA Post-Inspection Written Preliminary Findings to Randy Bareither. Attachments IPUC Inspection Form 1 IA Post-Inspection Written Preliminary Findings Avista documents and records. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes lNol X Inspector(Lead): Date: Galli j Reviewer: Brooks Date: 15 , IPUC Form 1