Loading...
HomeMy WebLinkAboutAvista 2023 IPUC Form - DIMP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins (Lead), Brooks, Galli Date(s): 10/31/2023 Company/Owner: JAvista Utilities Unit#/OPID 18160 Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 3 Standard: Training: (T)(D) Integrity Management: 1 3 Incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of Idaho Public Utilities Commission (IPUC) inspectors Perkins (Lead), Brooks, Galli auditing Avista Distribution Integrity Management Plan (DIMP)for compliance with applicable regulation as they relate to Subpart P. October 23, 2023: (1.0)(Prep) Integrity Management Plan Reviewed DIMP Manual and supporting records against IA question set for compliance with Subpart P. October 31, 2023: (1.5) Integrity Management Plan Conducted a joint audit virtually with Oregon PUC and Washington UTC. See attendance list in IA for full list of participants. Reviewed various procedures and records. October 31,2023: (0.5)(Post) Integrity Management Plan Wrote IPUC Form 1 and sent Post-Inspection Written Preliminary Findings to Randy Barieither, Pipeline Safety Engineer. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Perkins 10/31/2023 Reviewer: All Date: Brooks If IPUC Form 1