HomeMy WebLinkAboutIntermountain Gas 240916 Middleton Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 09/16/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 1327 & 1339 Old Mill St City/District: Middleton Contractor/Job #: Foreman: Employees: Bryan Bottomley 363-004177, 363-049970 Nathan Gulley Job Description: Install %" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe One-Call Ticket: 2024371201 &2024371203 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# 1 Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Re lator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 Cleaning purge 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 Did not observe IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Butt Fusion and Con- - Joiner(s) Qualified OPS 309 Stabs - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector(s) observed Das-Co, a contractor for IGC install 3/4" service line(s). Address: 1327 & 1339 Old Mill St(split service) Observations Included: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, valid dig ticket, PE butt fusions, mechanical fittings (con-stabs), tracer wire install, squeeze off, cleaning purge, bedding with sand, backfill and continuity testing. Quizzed employees on applicable AOCs of squeeze off procedures and meter placement. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 09/16/2024 Galli Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023