Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240916 Meridian Construction
IPUC Construction Inspection Inspector(s): Brooks Date(s): 9-16-24 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 4544 N McKinley Park Ave City/District: Meridian Contractor/Job #: Dasco Foreman: Employees: 051492-413 M. Krebs J. Gonzalez, E. Macias Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 341183 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 l Labelin 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 100 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 ` SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/Zv2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install a 3/4" service line in Meridian, ID. Addresses: 4544 N McKinley Park Ave Observations Included: Excavation, trench depths, safety equipment, verification of OQs, equipment calibrations, tracer wire, stab fittings, line squeeze, EFV installation, successful pressure test, bedding, backfill, and purge. Quizzed employees on applicable AOCs of purge procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 9-16-24 Brooks Reviewer: Date: IPUC Form 4 Rev. 12/21/2023