HomeMy WebLinkAboutIntermountain Gas 240911 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 09/11/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 3083 E Barber Valley Dr City/District: Boise
Contractor/Job #: Foreman: Employees: See Job List
118378-425 Jesus Garcia
Job Description: Install 2" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024361354
On-Site: Will Lindsey
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 40" deep trench
OPS 322
3. Bedding/Backfill N/A OPS 308
SF 418
4. Pipe Installation(Tracer Wire) N/A OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation N/A OPS 301 5500 EFV
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge N/A OPS 603
18. Safety Equipment Unsat SF 418 Fire extinguisher
SF 422 inspection
expired/unusable
19. Abandonment N/A OPS 607
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
20. Line Locating SAT OPS 611 Unmarked sewer
21. Plastic Pipe SAT OPS 307 Fused on riser and EFV
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pip N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC start installing a 2" service line in Boise,
ID.
Address: 3083 E Barber Valley Dr.
Observations Include: Fusing(EFV/Riser), verification of OQ records, line locating ,scaffolding was in
the way to complete trenching, unmarked sewer line discovered, fire extinguishers were both expired for
inspection and big extinguisher had been discharged/out of green zone on dial. Cord on heater/iron had
a frayed plug-in and advised to replace. JSA was not filled out prior to commencing job. PPE gear was
not worn as required. Quizzed personnel on excavation rules/laws. All observed safety procedures were
not followed in accordance with IGC Operations and Maintenance Manual. I called IGC/Das-co
leadership and informed them of the discrepancies.
Corrective Action Required: Followed up with IGC/Das-Co mgmt. Yes X No
Follow-up Required: By Date: Yes No X
Inspector (Lead):
Date: 09/10/2024
Perkinsell
Reviewer: v
Brooks Date: 9•��-aoay
IPUC Form 4 Rev. 12/2v2023