HomeMy WebLinkAboutIntermountain Gas 240910 Kuna Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 09/10/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 2132 E Wythe Creek St City/District: Kuna
Contractor/Job #: Foreman: Employees: See Job List
012450-375 Jose Garcilazo
Job Description: Install %" Service Line System Type: a Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024362640
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 Sleeve under driveway
OPS 322
3. Bedding/Backfill SAT OPS 308 Bedded with sand
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation SAT OPS 301 1200 EFV
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT I SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Fused on riser and EFV
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos'wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/4" service line in Kuna, ID.
Address: 2132 E Wythe Creek St.
Observations Include: Fusing, verification of OQ records, line locating,purging, bedding and trenching.
Quizzed personnel on excavation rules/laws. All observed procedures were followed in accordance
with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead):
Date: 09/10/2024
Perkins
Reviewer: ✓
Date:
Brooks