Loading...
HomeMy WebLinkAboutIntermountain Gas 240910 Boise Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 9-10-24 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 2436 S Palmatier Ln City/District: Boise Contractor/Job#: Dasco Foreman: Employees: S. Strawn, H. Russell 118429-425 J. Maceda Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Will One-Call Ticket: 362000 On-Site: N Total Inspection Days: .5 F Tasks: Ratin Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install 3/4" service line(s) in Boise, ID. Addresses: 2436 S Palmatier Ln Observations Included: Excavation, trench depth, safety equipment, verification of OQs, equipment calibrations, tracer wire, plastic butt fusions, line squeeze, EFV installation, successful pressure test at 96 psi for 15 minutes, bedding and backfill. Quizzed employees on applicable AOCs of static spray and procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 9-10-24 Brooks Reviewer: Date: IPUC Form 4 Rev. 12/21/2023