HomeMy WebLinkAboutIntermountain Gas 240910 Boise Construction IPUC Construction Inspection
Inspector(s): Brooks Date(s): 9-10-24
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 2436 S Palmatier Ln City/District: Boise
Contractor/Job#: Dasco Foreman: Employees: S. Strawn, H. Russell
118429-425 J. Maceda
Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Will One-Call Ticket: 362000
On-Site: N
Total Inspection Days: .5
F Tasks: Ratin Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Verified
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
-Squeeze Off
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Brooks observed Das-Co, a contractor for IGC install 3/4" service line(s) in Boise, ID.
Addresses: 2436 S Palmatier Ln
Observations Included: Excavation, trench depth, safety equipment, verification of OQs, equipment
calibrations, tracer wire, plastic butt fusions, line squeeze, EFV installation, successful pressure test at
96 psi for 15 minutes, bedding and backfill. Quizzed employees on applicable AOCs of static spray and
procedures. All procedures were followed in accordance with IGC Operations and Maintenance
Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead): Date: 9-10-24
Brooks
Reviewer:
Date:
IPUC Form 4 Rev. 12/21/2023