Loading...
HomeMy WebLinkAboutIntermountain Gas 240905 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 09/05/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 4232 S Graycliff Way City/District: Meridian Contractor/Job #: Foreman: Employees: See job list 413-51534 Adrian Wesley Job Description: Install %" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024350116 On-Site: N Total Inspection Days: 0.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, N/A OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance N/A OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M UNSAT OPS 611 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 Did not observe 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 Did not observe 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating UNSAT OPS 611 Hand dig without markings P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector(s) observed Das-Co, a contractor for IGC install 3/4" service line(s). Address: 4232 S Graycliff Way, Meridian, ID Observations Included: Safety equipment, verification of OQ records, valid dig ticket but no visible markings. Discrepancies: Upon arrival the IPUC inspector observed a Das-Co crew hand digging a trench in the immediate vicinity of live power. The crew had an unexpired dig ticket, however no visible markings or flags were in the area. While attempting to locate the gas service stub, the crew inadvertently made contact and damaged a communication line conduit (unknown if the communication conduit was live). Per Idaho Statute 55-2205 (2), 55-2205 (5), 55-2207 (2), and MDU OPS 611 Section 2.1 and 2.5; all - underground facilities shall be located and marked prior to commencing excavation. Das-co Area Superintendent was notified and advised the crew to skip the install until new locates are completed. IGC Compliance Manager was notified of the probable violation. M G Corrective Action Required: NOPV 1202413 Yes X No Follow-up Required: By Date: October 25 024 Yes X j No Inspector (Lead): - � Date: 09/16/2024 Galli Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023