Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240905 Kuna Construction
I PUC Construction Inspection Inspector(s): Galli Date(s): 09/05/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: Pura Vida Ranch#1 City/District: Kuna Contractor/Job #: Foreman: Employees: See job list 425-9807 Cristian Ponce- Bobadilla Job Description: Install 2" Main Line(s) with System Type: x Distribution ❑ Transmission %" Service Line stubs Operator Supervisor: Mingo One-Call Ticket: 2024322823 On-Site: N Total Inspection Days: 0.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labelin 2. Trenching/Boring—Depth, Clearance SAT OPS 308 At least 36 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14 gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type NC OPS 505 Did not observe 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification NC OPS 501 Did not observe 15. EFV Installation SAT OPS 301 Installed UMAC 2600 series EFVs with mainline 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge NC OPS 603 Did not observe 18. Safety Equipment SAT SF 418 Fire Extinguisher SF 422 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 19. Abandonment N/A OPS 607 20. Line Locating NC OPS 611 Did not observe 21. Plastic Pipe SAT OPS 307 Observed completed - Joiner(s) Qualified OPS 309 fusions - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pine N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector(s) observed Das-Co, a contractor for IGC install 2"main line(s) with 3/" service stubs Address: Pura Vida Ranch#1 Subdivision, Kuna, ID Observations Included: Correct trench depth, safety equipment, verification of OQ records, valid dig ticket, completed PE butt fusions of 2"main and 3/" service stubs, observed completed 2"to 3/4"Bolt- on saddle tees, tracer wire, bedding with sand. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 09/05/2024 Galli Reviewer: Date: Brooks IPUC Form 4 Re,. 12/21/2023