Loading...
HomeMy WebLinkAboutIntermountain Gas 240904 Caldwell Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 09/04/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: Mason Creek Landing and City/District: Caldwell Mason Creek Grove Contractor/Job#: Foreman: Employees: N/A Crown Utilities Juan Carlos Pozos 317-1985 317-1890 Job Description: Install 2" Main Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe 'One-Call Ticket: 2024310772 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling ! 2. Trenching/Boring—Depth, Clearance SAT OPS 308 At least 36 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14 gauge installed OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type NC OPS 505 Did not observe 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation NC OPS 301 Installed 1200 EFVs with mainline 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA 19. Abandonment N/A OPS 607 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 20. Line Locating N/A OPS 611 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector(s) observed Crown Utilities, a contractor for IGC install 2" main line(s). Address: Mason Creek Landing and Mason Creek Grove Subdivisions, Caldwell, ID Observations Included: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, valid dig ticket, PE butt fusions, tracer wire, squeeze off, bedding with sand. Quizzed employees on applicable AOCs of butt fusion,purging, sleeving of plastic carrier pipe, squeeze off procedures. Observed a fuser cut out a fuse that did not meet acceptable criteria for high-low and had an indentation on the rollback on the bottom side of the fuse. Discrepancies: • Observed employee fuse within 12" of a squeeze off location. IPUC inspector advised the employee of the correct procedure per OPS 309. • Fuser was unaware of the proper fusing temperature for butt fusions when asked. Fuser stated between 450 and 500. IPUC inspector advised the employee of the correct procedure per OPS 307. • Employee did not conduct a cleaning purge prior to fusing. IPUC inspector advised the employee of the correct procedure per OPS 603. Employee made the decision to correct all observed discrepancies to comply with applicable IGC procedures. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 09/04/2024 Galli Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023