HomeMy WebLinkAboutIntermountain Gas 240904 Caldwell Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 09/04/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: Mason Creek Landing and City/District: Caldwell
Mason Creek Grove
Contractor/Job#: Foreman: Employees: N/A
Crown Utilities Juan Carlos Pozos
317-1985 317-1890
Job Description: Install 2" Main Line(s) System Type: ® Distribution ❑ Transmission
Operator Supervisor: Joe 'One-Call Ticket: 2024310772
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling !
2. Trenching/Boring—Depth, Clearance SAT OPS 308 At least 36 inches
OPS 322
3. Bedding/Backfill SAT OPS 308 Bedding with sand
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308 14 gauge installed
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type NC OPS 505 Did not observe
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Verified
15. EFV Installation NC OPS 301 Installed 1200 EFVs
with mainline
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418 Fire Extinguisher and
SF 422 JSA
19. Abandonment N/A OPS 607
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
20. Line Locating N/A OPS 611
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
-Squeeze Off
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector(s) observed Crown Utilities, a contractor for IGC install 2" main line(s).
Address: Mason Creek Landing and Mason Creek Grove Subdivisions, Caldwell, ID
Observations Included: Correct trench depth, safety equipment, verification of OQ records, verification
of equipment calibrations, valid dig ticket, PE butt fusions, tracer wire, squeeze off, bedding with sand.
Quizzed employees on applicable AOCs of butt fusion,purging, sleeving of plastic carrier pipe, squeeze
off procedures. Observed a fuser cut out a fuse that did not meet acceptable criteria for high-low and
had an indentation on the rollback on the bottom side of the fuse.
Discrepancies:
• Observed employee fuse within 12" of a squeeze off location. IPUC inspector advised the
employee of the correct procedure per OPS 309.
• Fuser was unaware of the proper fusing temperature for butt fusions when asked. Fuser stated
between 450 and 500. IPUC inspector advised the employee of the correct procedure
per OPS 307.
• Employee did not conduct a cleaning purge prior to fusing. IPUC inspector advised the
employee of the correct procedure per OPS 603.
Employee made the decision to correct all observed discrepancies to comply with applicable IGC
procedures.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
Date: 09/04/2024
Galli
Reviewer:
Brooks Date:
IPUC Form 4 Rev. 12/21/2023