Loading...
HomeMy WebLinkAboutIntermountain Gas 240903 Meridian Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 09/03/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Com any(IGC) Address: Pera Place subdivision on the corner of City/District: Meridian Dapne & N Colosseum ave Contractor/Job#: Foreman: Employees: See Job List 413-1964 Justin DeCaprio Job Description: Tie in 2" mains with Tee System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: N/A On-Site: Will Lindsey Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance N/A OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M N/A 8. Testing—Pressure, Duration,Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment N/A SF 418 SF 422 19. Abandonment N/A OPS 607 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 21. Plastic Pine UNSAT OPS 307 Fusing 2" PE Tee to - Joiner(s) Qualified OPS 309 2"mains. - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Crown, a contractor for IGC fuse a 2"Tee to 2"main lines in Meridian, ID. Address: : Pera Place subdivision on the corner of Dapne &N Colosseum ave Observations Include: Fusing, verification of OQ records. Quizzed personnel on separation of gas lines from other utilities and steps for fusing. All observed procedures were not followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: NOPV 1202412 Yes X No Follow-up Required: By Date: 3 Nov 2024 Yes X No Inspector (Lead): , `, > Date: 09/03/2024 Perkins Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023