HomeMy WebLinkAboutIntermountain Gas 240828 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 08/28/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 2214 N Dove Ave City/District: Boise
Contractor/Job# Foreman: Employees: See Job List
118398-425 Ethan Call
Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024341147
On-Site: Y Will
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill N/A OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/2v2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
-Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe SAT OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install V Service Line in Boise, ID.
Address: 2214 N Dove Ave
Observations Include: Verification of OQ records, fusing, welding, boring, potholing, EFV install,
tracer wire, line locating and trenching. Quizzed employee on relax time of PE after pullback on a bore.
All observed procedures/manufacturer instructions were followed in accordance with IGC Operations
and Maintenance Manual.
Corrective Action Required: Yes No
Follow-up Required: By Date: Yes No
Inspector(Lead):
Perkins Date: 08/28/2024
Reviewer:
Brooks Date:
IPUC Form 4 Rev. 12/21/2023