Loading...
HomeMy WebLinkAboutIntermountain Gas 240828 Boise Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 08/28/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 2214 N Dove Ave City/District: Boise Contractor/Job# Foreman: Employees: See Job List 118398-425 Ethan Call Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024341147 On-Site: Y Will Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 In File 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install V Service Line in Boise, ID. Address: 2214 N Dove Ave Observations Include: Verification of OQ records, fusing, welding, boring, potholing, EFV install, tracer wire, line locating and trenching. Quizzed employee on relax time of PE after pullback on a bore. All observed procedures/manufacturer instructions were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No Follow-up Required: By Date: Yes No Inspector(Lead): Perkins Date: 08/28/2024 Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023