Loading...
HomeMy WebLinkAboutIntermountain Gas 240822 Boise Construction IPUC Construction Inspection Inspector(s): Galli, Brooks �Date(s): 08/22/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 9500 W Dry Creek Road City/District: Boise Contractor/Job #: Foreman: Employees: See Lineup 425-118160 Ethan Call Job Description: Install 2" PE Main from System Type: ® Distribution ❑ Transmission a 4" Steel Main Operator Supervisor: Joe One-Call Ticket: NC On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, N/A OPS 11 I_abelin�„ 2. Trenching/Boring—Depth, Clearance N/A OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M N/A 8. Testing—Pressure, Duration,Type N/A OPS 505 9. OQ Qualifications N/A OPS 800 10. Casij% Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment N/A SF 418 SF 422 19. Abandonment _ N/A OPS 607 20. Line Locating N/A OPS 611 IPUC Form 4 Re,. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 -Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks attempted to observe Das-Co, a contractor for IGC install 2"PE main line(s) to a 4" steel service line in the Dry Creek Subdivision of Boise, ID. No gas work was performed while IPUC inspectors were on site. Corrective Action Required: Yes No Follow-up Required: By Date: Yes No Inspector(Lead): Date: 08/22/2024 Galli Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023