HomeMy WebLinkAboutIntermountain Gas 240820 Nampa Construction I PUC Construction Inspection
Inspector(s): Galli Date(s): 08/20/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 1378 W Ultar Drive City/District: Nampa
Contractor/Job #: Foreman: Employees: See Lineup
371-052855 Dominic Greco
Job Description: Install '/" Service Lines System Type: ® Distribution ❑ Transmission
Operator Supervisor: Mingo One-Call Ticket: 2024322974
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 18 inches
OPS 322
3. Bedding/Backfill SAT OPS 308 Bedding with sand
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308 14 gauge
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration,Type SAT OPS 505 See additional comments
9. OQ Qualifications SAT OPS 800 Verified
10. Casin Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Verified
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418 Fire Extinguisher and
SF 422 JSA
19. Abandonment N/A OPS 607
20. Line Locating N/A OPS 611
I P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe UNSAT OPS 307 Squeeze off procedures
- Joiner(s) Qualified OPS 309 not followed
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
-Squeeze Off
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co, a contractor for IGC install 3/4" service line(s).
Address: 1378 W Ultar Drive, Nampa, ID
Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification
of equipment calibrations, valid dig ticket, PE butt fusions, tracer wire, EFV 1200 installation, pressure
test at 98 psi for 15 minutes, squeeze off, mechanical fitting (con-stab), bedding with sand and backfill.
Observed employee cut out a fuse that did not pass visual acceptance criteria. Quizzed employee on
applicable AOCs of squeeze off procedures.
Discrepancies: IPUC inspector observed a contractor representing IGC squeeze a V service line
without using a soapy water solution and wet non synthetic cloth(such as cotton or burlap material)
upstream of squeeze location, or commercially available electrostatic discharge fluid.
Corrective Action Required: NOPV 1202411 Yes X No
Follow-up Required: By Date: October 4, 2024 Yes X No
Inspector (Lead): Date: 08/20/2024
Galli
Reviewer:
Brooks Date: 8--),o .�� J
IPUC Form 4 Rev. 12/21/2023