Loading...
HomeMy WebLinkAboutIntermountain Gas 240820 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 08/20/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 1208/1216 S Sunset Cove In City/District: Eagle Contractor/Job # Foreman: Employees: See Job List 048686-417,048687-417 Michael Krebbs Job Description: Install 3/" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024330891, 2024330889 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 100 psi 15 minutes 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 In File 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Lines in Eagle, ID. Address: 1208/1216 S Sunset Cove In Observations Include: Verification of OQ records, fusing (removed 3 stab fitting and fused new fittings as original set up was wrong/missing EFV), EFV install, stab fitting, pressure testing, tracer wire, line locating, squeezing, trenching, bedding and backfilling. Quizzed employee on squeeze and release times and depth of cover. All observed procedures/manufacturer instructions were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: , Yes No Inspector (Lead): Date: 08/20/2024 Perkins �� .per Reviewer: Date: Brooks $"�?o IPUC Form 4 Rev. 12/21/2023