Loading...
HomeMy WebLinkAboutIntermountain Gas 240815 Star Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 08/15/2024 _T Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 11144 W Coreopsis Dr City/District: Star Contractor/Job #: Foreman: Employees: See Lineup 367-08349 Pedro Velazquez Job Description: Install %" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 2024330652 On-Site: N Total Inspection Days: 0.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating I SAT OPS 611 Hand dig near stub IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 -Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for IGC install 3/4" service line(s) in Star, ID. Address: 11144 W Coreopsis Dr, Star, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, valid dig ticket, line locating, tracer wire, PE butt fusions. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Lam" Date: 08/15/2024 Galli Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023