Loading...
HomeMy WebLinkAboutIntermountain Gas 240815 Caldwell Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 08/15/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 11383 Nora Dr, 19113 Ralston Way City/District: Caldwell Contractor/Job # Foreman: Employees: See Job List 50809-317, 052847-317 Darcy Ugalde Job Description: Install 3/0" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024323044, 2024303149 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi 15 minutes 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 In File 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I I OPS 607 20. Line Locating 1 SAT OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Lines in Caldwell, ID. Address: 11383 Nora Dr Observations Include: Verification of OQ records, fusing, EFV install, stab fitting, pressure testing, tracer wire, line locating, squeezing,bedding and backfilling. Quizzed employee on squeeze and release times. All observed procedures/manufacturer instructions were followed in accordance with IGC Operations and Maintenance Manual). Address: 19113 Ralston Way Observations Include: Verification of OQ records, fusing, EFV install, fusing, pressure testing, tracer wire, line locating, squeezing, trenching, bedding and backfilling. Quizzed employee on squeeze and release times. All observed procedures/manufacturer instructions were followed in accordance with IGC Operations and Maintenance Manual). Corrective Action Required: Yes No Follow-up Required: By Dat Yes No Inspector(Lead): Date: 08/15/2024 Perkins Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023