HomeMy WebLinkAboutIntermountain Gas 240813 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 08/13/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 5106 W Promise Ln City/District: Boise
Contractor/Job# Foreman: Employees: See Job List
115738-425 Rigo Chavarin
Job Description: Install '/" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024302157
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi 15 minutes
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 61
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Line in Boise, ID.
Address: 5106 W Promise Ln
Observations Include: Verification of OQ records, fusing, EFV install, stab fitting,pressure testing,
tracer wire, line locating, squeezing, trenching, bedding and backfilling. Quizzed employee on squeeze
and release times. All observed procedures/manufacturer instructions were followed in accordance with
IGC Operations and Maintenance Manual).
Upon arrival at the job site, I detected the smell of gas and looked around and could not find it. I called
IGC leak line, and they sent service tech Ryan Leser out to investigate. He attempted to locate the leak
using a plume locator, bar holed and used a CGI and he determined that there must have been a dead
animal in the next door backyard (jungle).
Corrective Action Required: Yes No
Follow-up Required: By Date: Yes No I X
Inspector (Lead): Date: 08/13/2024
Perkins
Reviewer: v
Brooks *L-L
Date: 1W•ty-ac
IPUC Form 4 Rev. 12/21/2023