HomeMy WebLinkAboutIntermountain Gas 240709-10 Nampa Construction IPUC Construction Inspection Inspector(s): Galli,Brooks Date(s): 07/09-10/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGQ Address: 610 N Robinson Blvd City/District: Nampa Contractor/Job#: Foreman: Employees: See Job List 052926-371 German Gomez Job Description: Install %" Service Lines System Type: ® Distribution ® Transmission Operator Supervisor: Mingo Primary One-Call Ticket: 2024263527 John and Monte were on-site on 7/10/2024 Total Inspection Days: 2.0 (MG), 0.5 (JB) Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24" in private property, OPS 322 48" in public property 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 14-Gauge from HPSS to OPS 322 meter set 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 Existing coal tar coating OPS 403 of 8"line 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 3/4" tapping tee to 8 inch 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 See additional comments 15. EFV Installation SAT OPS 301 EFV 300 on HP side of HPSS and 775 on LP side of HPSS 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 Did not observe 21. Plastic Pipe SAT OPS 307 3/4"PE butt fusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe SAT OPS 200 Welded a tapping tee to - Welder(s) Qualified OPS 201 an 8"high pressure Pipe/Coating—Inspected/Repaired OPS 202 critical line, multiple butt - Cathodic Protection OPS 306 welds on 3/4"bore pipe -Non-Destructive Testing OPS 401 with tape wrap. - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install 3/4" service line from an 8"high pressure critical line with an HPSS (High Pressure Service Set) in Nampa, ID. Address: 610 N Robinson Blvd, Nampa, ID Observations Include: Correct trench depth observed upon arrival, traffic control, safety equipment, verification of OQ records, verification of equipment calibrations, multiple welds on 3/4"bore pipe with tape wrap, potholing, boring and pull back under roadway, coating/asbestos removal, welded a tapping tee to the 8"high pressure critical line, GTI visually inspected weld quality and UT thickness. HPSS installation per OPS 300 and engineering diagrams (in file), EFV 300 on high pressure side and EFV 775 on low pressure side, steel to plastic pipe transition was on the outlet side of the HPSS via an anodeless riser, HPSS on the house side of the road, wrapped all welds, PE butt fusions, tracer wire install from HPSS to meter set, proper meter placement, successful pressure test on inlet side of HPSS at 760 psi for 15 minutes and outlet side of HPSS at 94 psi for 15 minutes, purging, bedding with sand and backfill. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 07/10/2024 Galli -� Reviewer: Date: d �� -Brooks IPUC Form 4 Rev. 12/2v2023