HomeMy WebLinkAboutIntermountain Gas 240709 Star Construction IPUC Construction Inspection Inspector(s): Brooks �Date(s): 7-9-24 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 8166 W Inspirado Dr City/District: Star Contractor/Job #: Foreman: Employees: S. Strawn, C. Montiel 052845-367 N. Gulley Job Description: Install V Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 270257 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casin Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 Rough Handling time - JoinersQualified OPS 309 met. IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install 3/4" service line(s) in Star, ID. Addresses: 8166 W Inspirado Drive Observations Included: Trench depth, safety equipment, verification of OQs, equipment calibrations, tracer wire, plastic butt fusions, line squeeze, EFV 1200 installations,pressure test at 98 psi for 15 minutes, riser placement, bedding, and backfill. Quizzed employees on calibration AOCs of fusion equipment and procedures, squeeze times, and rough handling. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Brooks Date: 7-9-24 Reviewer: Date: IPUC Form 4 Rev. 12//21/2023