HomeMy WebLinkAboutIntermountain Gas 240709 Eagle Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 07/09/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 2684 N Pescara Ln City/District: Eagle
Contractor/Job# Foreman: Employees: See Job List
016336-417 Michael Krebbs
Job Description: Install V Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024261673
On-Site: N
Total Inspection Days: 2.0 (1) day compliance
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labelin
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation UNSAT OPS 302 Used PE cutter as the
handle on the Mcelroy
2LC cradle. Advised
FOC Mingo. Fuses were
cut out
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
21. Plastic Pipe UNSAT OPS 307 Used PE cutter as the
- Joiner(s) Qualified OPS 309 handle on the Mcelroy
- Fusion Tools OPS 324 2LC cradle. Advised
- Heat Plate OPS 325 FOC Mingo. Fuses were
- Joining Procedure OPS 800 cut out
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Line in Eagle, ID.
Address: 2684 N Pescara Ln
Observations Include: Verification of OQ records, tracer wire, line locating, squeezing, trenching,
bedding and backfilling. (Contract employee who was fusing,used PE cutter as the handle on the
Mcelroy 2LC cradle. Advised FOC Mingo and all fuses were cut out. Quizzed employee on squeeze and
release times. Not all observed procedures/manufacturer instructions were followed in accordance with
IGC Operations and Maintenance Manual).
Corrective Action Required: NOPV 1202407 Yes X No
Follow-up Required: By Date: 9 Jan 2025 Yes X No
Inspector (Lead):
Date: 07/10/2024
Perkins
_Reviewer:
Date:
Brooks
IPUC Form 4 Rev. 12/21/2023