Loading...
HomeMy WebLinkAboutIntermountain Gas 240708 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 07/08/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 5006 & 4992 W Riva Capri St City/District: Meridian Contractor/Job #: Foreman: Employees: Colin Zimmermann 48534-371, 052817-371 Librado Ruiz Job Description: Install %" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024250957, 2024250227 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-Guage OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 See additional comments 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher and ' SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Hand dig near stub IPUC Form 4 Re,. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for IGC install 3/4" service line(s) in Meridian, ID. Address: 5006 W Riva Capri St, Meridian, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, line locating, tracer wire, visual acceptance of PE butt fusions, EFV 1200 installation, successful pressure test at 96 psi for 15 minutes, squeeze off, purging, mechanical fittings (coupler) bedding with sand and backfill. Address: 4992 W Riva Capri St, Meridian, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, line locating, tracer wire and visual acceptance of PE butt fusions. Fusion equipment(cradle and facer)had no calibration dates on the machine. Per the fuser, he had cleaned the equipment at the end of last week(7/3/2024) and believes he rubbed the dates off. IGC compliance was able to provide valid calibration documentation. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 07/08/2024 Galli Reviewer: Brooks Date: g• 1. IPUC Form 4 Re,. 12/21/2023