HomeMy WebLinkAboutIntermountain Gas 240708 Meridian Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 07/08/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 5006 & 4992 W Riva Capri St City/District: Meridian
Contractor/Job #: Foreman: Employees: Colin Zimmermann
48534-371, 052817-371 Librado Ruiz
Job Description: Install %" Service Lines System Type: ® Distribution ❑ Transmission
Operator Supervisor: Kyle One-Call Ticket: 2024250957, 2024250227
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand used
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308 14-Guage
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 See additional comments
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418 Fire Extinguisher and
' SF 422 JSA
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611 Hand dig near stub
IPUC Form 4 Re,. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
-Squeeze Off
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co, a contractor for IGC install 3/4" service line(s) in Meridian, ID.
Address: 5006 W Riva Capri St, Meridian, ID
Observations Include: Correct trench depth, safety equipment, verification of OQ records, line locating,
tracer wire, visual acceptance of PE butt fusions, EFV 1200 installation, successful pressure test at 96
psi for 15 minutes, squeeze off, purging, mechanical fittings (coupler) bedding with sand and backfill.
Address: 4992 W Riva Capri St, Meridian, ID
Observations Include: Correct trench depth, safety equipment, verification of OQ records, line locating,
tracer wire and visual acceptance of PE butt fusions.
Fusion equipment(cradle and facer)had no calibration dates on the machine. Per the fuser, he had
cleaned the equipment at the end of last week(7/3/2024) and believes he rubbed the dates off. IGC
compliance was able to provide valid calibration documentation.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead): Date: 07/08/2024
Galli
Reviewer:
Brooks Date: g• 1.
IPUC Form 4 Re,. 12/21/2023