HomeMy WebLinkAboutIntermountain Gas 240708 Kuna Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 07/08/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC
Address: 78 S Ryde Ave City/District: Kuna
Contractor/Job# Foreman: Employees: See Job List
012386-375 Jose Mendoza
Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024250923
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 100 psi 15 min
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302 Did not wrap PE/Carrier
pipe ends as required by
OPS 325 (2.4)until
advised by FOC.
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
IPUC Form 4 Rev. 12/2v2023
IPUC Construction Inspection
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
-Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
-Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Line in Kuna, ID.
Address: 78 S Ryde Ave
Observations Include: Verification of OQ records, tracer wire, line locating, fusing, squeezing, purging,
pressure testing, bedding and backfilling. Quizzed employees on squeeze and release times and
pressure testing times. All observed procedures were followed in accordance with IGC Operations and
Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 07/08/2024
Perkins �L�
Reviewer: � r �
Brooks % Date: 7-?_ oty
IPUC Form 4 Rev. 12/21/2023