Loading...
HomeMy WebLinkAboutIntermountain Gas 240703 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 07/03/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 4417 & 4161 S Graycliff Way City/District: Meridian Contractor/Job#: Foreman: Employees: Adrian Wesley 051224-413, 049807-413 Darcy Ugalde Job Description: Install 3/" Service Lines System Type: x Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024261816, 2024261815 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials —Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-Guage OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments 9. OQ Qualifications SAT OPS 800 Verified 10. Casin Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified and in file 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher and SF 422 JSA F 19. Abandonment I N/A I OPS 607 20. Line Locating SAT OPS 611 Continuity Testing IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 -Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for IGC install 3/4" service line(s)in Meridian, ID. Address: 4417 S Graycliff Way, Meridian, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, line locating, tracer wire, visual acceptance of plastic butt fusions, EFV 1200 installation, successful pressure test at 100 psi for 15 minutes, squeeze off, purging, bedding with sand, backfill and continuity testing. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 4161 S Graycliff Way, Meridian, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, line locating, tracer wire, visual acceptance of plastic butt fusions and EFV 1200 installation. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 07/03/2024 Galli Reviewer: Brooks Date: 7. IPUC Form 4 Rev. 12/21/2023