HomeMy WebLinkAboutIntermountain Gas 240702 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 07/01/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 3607 W Yates St City/District: Boise
Contractor/Job# Foreman: Employees: See Job List
24NG3188 German Gomez
Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024260733
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 Customer provided
OPS 322 trench
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition SAT OPS 401 Coating on steel
OPS 403 abandoned stub was
coated well.
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi 15 min
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302 3/" steel to V PE
12. Tie-In/Hot Tapping SAT OPS 600 3/" steel half pot/stopple
then welded on %" PE
transition fittin .
13. Meter Location/Regulator Testing N/A J OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
IPUC Form 4 Rev. 12/21/2023
I PUC Construction Inspection
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine SAT OPS 200 1/" steel half pot/stopple
- Welder(s) Qualified OPS 201 then welded on 3/" PE
Pipe/Coating—Inspected/Repaired OPS 202 transition fitting
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Line in Boise, ID.
Address: 3607 W Yates St
Observations Include: Verification of OQ records, tracer wire, line locating, fusing, stab fittings,
welding, tapping/stopple, steel/PE transition fitting, squeezing, purging, pressure testing, bedding and
backfilling. Quizzed employees on squeeze and release times and pressure testing times. All observed
procedures were followed in accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: jByt Yes J No IX
Inspector(Lead):
Date: 07/02/2024
Perkins
Reviewer: U
Date:
Brooks
IPUC Form 4 Rev. 12/21/2023