Loading...
HomeMy WebLinkAboutIntermountain Gas 240702 Boise Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 07/01/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 3607 W Yates St City/District: Boise Contractor/Job# Foreman: Employees: See Job List 24NG3188 German Gomez Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024260733 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 Customer provided OPS 322 trench 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 Coating on steel OPS 403 abandoned stub was coated well. 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi 15 min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 3/" steel to V PE 12. Tie-In/Hot Tapping SAT OPS 600 3/" steel half pot/stopple then welded on %" PE transition fittin . 13. Meter Location/Regulator Testing N/A J OPS 302 14. Equipment Calibration Verification SAT OPS 501 In File 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 IPUC Form 4 Rev. 12/21/2023 I PUC Construction Inspection 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine SAT OPS 200 1/" steel half pot/stopple - Welder(s) Qualified OPS 201 then welded on 3/" PE Pipe/Coating—Inspected/Repaired OPS 202 transition fitting - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Line in Boise, ID. Address: 3607 W Yates St Observations Include: Verification of OQ records, tracer wire, line locating, fusing, stab fittings, welding, tapping/stopple, steel/PE transition fitting, squeezing, purging, pressure testing, bedding and backfilling. Quizzed employees on squeeze and release times and pressure testing times. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: jByt Yes J No IX Inspector(Lead): Date: 07/02/2024 Perkins Reviewer: U Date: Brooks IPUC Form 4 Rev. 12/21/2023