Loading...
HomeMy WebLinkAboutIntermountain Gas 240701 Caldwell Construction IPUC Construction Inspection Inspector(s): Galli, Brooks Date(s): 07/01/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 14550 & 14562 Pine Knoll St City/District: Caldwell Contractor/Job#: Foreman: Employees: Jose Garcia 052720-317, 050240-317 Rigo Chavarin Job Description: Install V Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe One-Call Ticket: 243130, 243132 On-Site: N Total Inspection Days: 2 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install 3/4" service line(s) in Caldwell, ID. Addresses: 14550 & 14562 Pine Knoll St Observations Included: Trench depth, safety equipment, line locating, verification of OQ, verified equipment calibrations, and plastic butt fusion. Quizzed employees on sleeving PE pipe. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): /-' Date: 07/01/2024 Brooks Reviewer: Date: 7- I- ZL4 IPUC Form 4 Re,. 12/21/2023