Loading...
HomeMy WebLinkAboutIntermountain Gas 240626-27 Kuna Construction PUC Construction Inspection Inspector(s): Perkins Date(s): 06/26-27/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 2748/2764/2716 E Night Rider Dr City/District: Kuna Contractor/Job # Foreman: Employees: See Job List 012383-375, 009512-375 Jose Mendoza 012384-375 Job Description: Install %" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024250916, 2024250915, On-Site: N 2024250918 Total Inspection Days: 2.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 99 PSI-15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 One shaver had no inspection tag, and the other shaver inspection to was expired 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 IPUC Form 4 Re,. 12/21/2023 IPUC Construction Inspection SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Lines in Kuna, ID. Address: 2748/2764/2716 E Night Rider Dr Observations Include: Verification of OQ records, tracer wire, line locating, trenching, fusing(see comments on page 1), 1200 EFV, purging, pressure testing, bedding and backfilling. Quizzed employees on squeeze and release times and pressure testing times. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 06/27/2024 Perkins ! - Reviewer: Brooks Date: 7- 1 „ �, i4 IPUC Form 4 Rev. 12/21/2023