HomeMy WebLinkAboutIntermountain Gas 240618 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 06/18/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGQ
Address: 4205/4223 N Madden Way City/District: Meridian
Contractor/Job# Foreman: Employees: See Job List
051157-413, 049101-413 Librado Ruiz
Job Description: Install %" Service Lines System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024220144,2024231036
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSI- 15 Min
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 In File
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine --'SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
-Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/" Service Lines in Meridian,
ID.
Address: 4205/4223 N Madden Way
Observations at 4205 N Madden Way include: Verification of OQ records, EFV, tracer wire, trenching,
fusing, stab fittings, line locating,pressure testing, purging, bedding and backfilling. Observations at
4223 N Madden Way include: line locating, tracer wire and trenching. All observed procedures were
followed in accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead):
Perkins i ��' Date: 06/18/2024
Reviewer:
Brooks
Date:
IPUC Form 4 Rev. 12/21/2023