HomeMy WebLinkAboutIntermountain Gas 240606 Nampa Construction I PU C Construction Inspection
Inspector(s): Perkins Date(s): 06/06/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 11324&11317 Nora Dr City/District: Nampa
Contractor/Job Foreman: Employees: See Job List
317-1856 KC Osmus
Job Description: Install %" PE Services System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024221207
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 99/98 PSI
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping NA OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/2v2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Piue N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
-Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install V service lines in Nampa, ID.
Address: 11324&11317 Nora Dr
Observations Include: Fusing V service risers/EFV's and associated piping, verification of OQ records,
tracer wire, trenching/backfilling, pressure testing, purging, and line locating. Quizzed personnel on
AOC's squeeze and release time for pinch-off. All observed procedures were followed in accordance
with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Dade: Yes No X
Inspector (Lead): ,f
Perkins ,/'/✓ �~ Date: 06/06/2024
Reviewer:
Brooks Date:
IPUC Form 4 Rev. 12/21/2023