Loading...
HomeMy WebLinkAboutIntermountain Gas 240606 Nampa Construction I PU C Construction Inspection Inspector(s): Perkins Date(s): 06/06/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 11324&11317 Nora Dr City/District: Nampa Contractor/Job Foreman: Employees: See Job List 317-1856 KC Osmus Job Description: Install %" PE Services System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024221207 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 99/98 PSI 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping NA OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Piue N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install V service lines in Nampa, ID. Address: 11324&11317 Nora Dr Observations Include: Fusing V service risers/EFV's and associated piping, verification of OQ records, tracer wire, trenching/backfilling, pressure testing, purging, and line locating. Quizzed personnel on AOC's squeeze and release time for pinch-off. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Dade: Yes No X Inspector (Lead): ,f Perkins ,/'/✓ �~ Date: 06/06/2024 Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023