HomeMy WebLinkAboutIntermountain Gas 240530 Star Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 05/30/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 1805, 1827, 1781 N Black Elm Lane City/District: Star
8837 W Snow Wolf Drive
Contractor/Job#: Foreman: Employees: See Job List
049890-367, 009330-367, Michael Krebbs
009331-367, 010334-367
Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission
Operator Supervisor: Kyle One-Call Ticket: 2024221517,2024221519,
On-Site: N 2024221522, 2024211209
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand used
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 2/23/2025
Pres Gauge 3/12/2025
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418 Fire Extinguisher/JSA
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611 Only on Snow Wolf Dr
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co a contractor for IGC install 3/4" service line(s) in Meridian, ID.
Address: 1805 and 1827 (Split Service)N Black Elm Lane, Star, ID
Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification
of equipment calibrations, tracer wire, visual acceptance of completed butt fusions, EFV 1200
installation, observed correct separation of 4" from electrical conduit, successful pressure test at 98 psi
for 15 minutes, squeeze off, mechanical fittings (con-stab),purging, bedding with sand, backfill and
continuity testing.
Address: 1781 N Black Elm Lane, Star, ID
Observations Include: Correct trench depth, safety equipment, tracer wire, visual acceptance of
completed butt fusions, EFV 1200 installation, successful pressure test at 98 psi for 15 minutes, squeeze
off, mechanical fittings (con-stab) bedding with sand, purging, backfill and continuity testing.
Address: 8837 W Snow Wolf Drive, Star, ID
Observations Include: Correct trench depth, line locating, safety equipment, tracer wire, butt fusions,
EFV 1200 installation, successful pressure test at 95 psi for 15 minutes, purging, squeeze off, bedding
(sand not needed) and backfill.
All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): "' - Date: 05/30/2024