HomeMy WebLinkAboutIntermountain Gas 240530 Star Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 05/30/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 1805, 1827, 1781 N Black Elm Lane City/District: Star 8837 W Snow Wolf Drive Contractor/Job#: Foreman: Employees: See Job List 049890-367, 009330-367, Michael Krebbs 009331-367, 010334-367 Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024221517,2024221519, On-Site: N 2024221522, 2024211209 Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 See additional comments 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 2/23/2025 Pres Gauge 3/12/2025 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher/JSA SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Only on Snow Wolf Dr IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 3/4" service line(s) in Meridian, ID. Address: 1805 and 1827 (Split Service)N Black Elm Lane, Star, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire, visual acceptance of completed butt fusions, EFV 1200 installation, observed correct separation of 4" from electrical conduit, successful pressure test at 98 psi for 15 minutes, squeeze off, mechanical fittings (con-stab),purging, bedding with sand, backfill and continuity testing. Address: 1781 N Black Elm Lane, Star, ID Observations Include: Correct trench depth, safety equipment, tracer wire, visual acceptance of completed butt fusions, EFV 1200 installation, successful pressure test at 98 psi for 15 minutes, squeeze off, mechanical fittings (con-stab) bedding with sand, purging, backfill and continuity testing. Address: 8837 W Snow Wolf Drive, Star, ID Observations Include: Correct trench depth, line locating, safety equipment, tracer wire, butt fusions, EFV 1200 installation, successful pressure test at 95 psi for 15 minutes, purging, squeeze off, bedding (sand not needed) and backfill. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): "' - Date: 05/30/2024 Galli Reviewer: Date:Brooks 6 w �-�,1 �i�_.� _II P U C Form 4 Rev. 12/21/2023