Intermountain Gas 240529 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli D eat (s): 05/29/2024 i Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 4145 S Graycliff Way City/District: Meridian Contractor/Job#: Foreman: Employees: See Job List 049808-413 Darcy Ugalde Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 2024201980 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration,Type SAT OPS 505 98 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 10/9/2024 Pres Gauge 4/18/2025 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Fume SAT OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher/JSA SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/Zv2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install3/4" service line(s) in Meridian, ID. Address: 4145 S Graycliff Way, Meridian, ID Observations Include: Correct trench depth, line locating, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire, butt fusion, EFV 1200 installation, successful pressure test, squeeze off, bedding with sand, backfill and continuity testing. Quizzed personnel on applicable AOCs of butt fusion and squeeze off. Contractor employee recognized several fusions that did not visually display acceptable criteria due to uneven roll back. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Galli Date: 05/29/2024 Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023