Loading...
HomeMy WebLinkAboutIntermountain Gas 240509 Boise Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 5/9/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 918W Ranch Rd City/District: Boise Contractor/Job # Foreman: Employees: See Job List 118186-425 Ethan Call Job Description: Install 3/4" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024161167 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 Unable to bore as too OPS 322 much rock in the way 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 -Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC attempt to install 3/4" service line in l Boise, ID. Address: 918 W Ranch Rd Observations Include: Line locating, cutting asphalt, welding tapping tee and digging down to main and attempting to bore but there were very large rocks preventing them. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes L X Follow-up Required: By Date:J. Yes No X Inspector(Lead): Perkins Date: 05/09/2024 Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023