HomeMy WebLinkAboutIntermountain Gas 240418 Meridian Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 04/18/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: N Linder Rd& Duck Valley City/District: Meridian Contractor/24NG3122 Foreman: Employees: See Job List Kyler Oakes Job Description: Install 4" Main System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024153004 On-Site: Will Lindsay Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 Tracer wire only OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A I OPS 603 18. Safety Equipment N/A SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 4"Main in Meridian, ID. Address: N Linder Rd/Duck Valley Observations Include: Verification of OQ records, tracer wire and trenching/pot-holing. Das-Co was digging trenches and they kept filling up because of water table, they continued pot-holing down the road to see if they could get out of the water table and were unsuccessful. Project will be moved to later this summer. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 04/18/2024 Perkins Reviewer: v Brooks Date: q- IPUC Form 4 Rev. 12/21/2023