HomeMy WebLinkAboutIntermountain Gas 240418 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 04/18/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: N Linder Rd& Duck Valley City/District: Meridian
Contractor/24NG3122 Foreman: Employees: See Job List
Kyler Oakes
Job Description: Install 4" Main System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024153004
On-Site: Will Lindsay
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill N/A OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308 Tracer wire only
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification N/A OPS 501
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A I OPS 603
18. Safety Equipment N/A SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe N/A OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 4"Main in Meridian, ID.
Address: N Linder Rd/Duck Valley
Observations Include: Verification of OQ records, tracer wire and trenching/pot-holing. Das-Co was
digging trenches and they kept filling up because of water table, they continued pot-holing down the
road to see if they could get out of the water table and were unsuccessful. Project will be moved to later
this summer. All observed procedures were followed in accordance with IGC Operations and
Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead): Date: 04/18/2024
Perkins
Reviewer:
v
Brooks Date: q-
IPUC Form 4 Rev. 12/21/2023