HomeMy WebLinkAboutIntermountain Gas 240416 Nampa Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 04/16/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Com an (IGC)
Address: Cherry Grove/Franklin Rd City/District: Nampa
Contractor/Job#: Foreman: Employees: See Job List
24JT125 Shane Diaz
Job Description: Install 2" Main and Service System Type: ® Distribution ❑ Transmission
Stubs
Operator Supervisor: One-Call Ticket: N/A
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance N/A OPS 308
OPS 322
3. Bedding/Backfill N/A OPS 308
_ SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A I OPS 603
18. Safety Equipment N/A SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating N/A OPS 611
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 2"Main and 3/" service stubs in
Nampa, ID.
Address: Cherry Grove/Franklin Rd
Observations Include: Fusing approximately 20ea V service stubs, verification of OQ records, tracer
wire and installing 2"PE in trenches. Quizzed personnel on separation of gas lines from other utilities
and excavation rules/laws. Personnel discovered AOC on bolt on saddle tee and said they were turning
it into the supply room. All observed procedures were followed in accordance with IGC Operations and
Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
Date: 04/16/2024
Perkins
Reviewer: 1
Brooks Date: q- 16' d_y