HomeMy WebLinkAboutIntermountain Gas 240416 Eagle Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 04/16/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 422 & 430 S Big Star Lane City/District: Eagle Contractor/Job #: Foreman: Employees: See Job List 016200-417 Librado Ruiz Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024152806,2024152804 On-Site: N Total Inspection Days: 1.0 Tasks: Rating J Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 9/8/2024 Pres Gauge 8/7/2024 15. EFV Installation N/A OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 Fire Extinguisher SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 3/4" service line(s) in Eagle, ID. Address: 422 &430 S Big Star Lane, Eagle, ID Observations Include: Correct trench depth, line locating, safety equipment, verification of OQ records, verification of equipment calibrations and butt fusion. Contractor employee recognized several fusions that did not visually display acceptable criteria due to uneven roll back. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes4 No X Inspector(Lead): Date: 04/16/2024 Galli Reviewer: Brooks Date: y_ 16 i IPUC Form 4 Rev. 12/21/2023