HomeMy WebLinkAboutIntermountain Gas 240411 Payette Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 04/11/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 725, 735, 740 Spy Glass Street City/District: Payette Contractor/Job #: Foreman: Employees: See Job List 006272-267, 006343-267, Jose Maceda 006264-267 Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe One-Call Ticket: 2024132366, 2024132367, On-Site: N 2024132265 Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Sand not needed SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge wire OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 100 & 98 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 10/9/2024 Pres Gauge 4/11/2024 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge SAT OPS 603 18. Safety Equipment SAT SF 418 JSA & Fire Extinguisher SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I I OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 3/4" service line(s) in Payette, ID. Address: 725 & 735 Spy Glass St, Payette, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire, butt fusion, EFV 1200, successful pressure test, mechanical fitting (con-stab coupler), squeeze off, bedding, backfill and continuity testing. Address: 740 Spy Glass St, Payette, ID Observations Include: Correct trench depth, line locating, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire, butt fusion, EFV 1200, successful pressure test, mechanical fitting(con-stab coupler), squeeze off, bedding and backfill. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes I No X Inspector (Lead): A I L/ Date: 04/11/2024 Galli Reviewer: Brooks Date: �� IPUC Form 4 Rev. 12/21/2023