HomeMy WebLinkAboutIntermountain Gas 240410-11 Eagle Construction I PUC Construction Inspection Inspector(s): Perkins Date(s): 04/10-11/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 1225 N Pebble Way City/District: Eagle Contractor/Job #: Foreman: Employees: See Job List 24NG3088 Jacob Pritt Job Description: Install 3/4" service System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024112055 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 95 PSI for 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter LocationJ lator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT�� OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/4" service line in Eagle, ID. Address: 1225 N Pebble Way Observations Include: Correct trench depth,pot-holing, boring, safety equipment, fusing, verification of OQ records, tracer wire, pressure testing,purging, bedding with sand and backfill. Quizzed personnel on separation of gas lines from other utilities and excavation rules/laws. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (lead): Perkins Date: 04/11/2024 Reviewer: Date: Brooks �-/6. 2•t f IPUC Form 4 Rev. 12/21/2023