HomeMy WebLinkAboutAvista 240403 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 04/03/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 2976 S Alcamo Way City/District: Meridian
Contractor/Job #: Foreman: Employees: See Job List
050990-413 Darcy Ugalde
Job Description: Install 3/4" service System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024130979
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Bedding with sand
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 98 PSI for 15 Min
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200 -
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/4" service line in Meridian, ID.
Address: 2976 S Alcamo Way
Observations Include: Correct trench depth, safety equipment, fusing, verification of OQ records, tracer
wire, pressure testing, purging, bedding with sand and backfill. Quizzed personnel on separation of gas
lines from other utilities and squeeze time of pipe. All observed procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
Perkins �j�� ---
Date: 04/03/2024
Reviewer:
Date:
Brooks "1 I
IPUC Form 4 Rev. 12/21/2023